CHLA OR
Los Angeles, CA
Client:
Children's Hospital of Los Angeles
Market:
Healthcare
Services:
Infrastructure
Size:
1,300 SQ. FT.
Estimated Compeletion Date:
Description:
The project involves removing existing equipment booms from two operating rooms and installing advanced Steris equipment booms with associated infrastructure upgrades. This initiative optimizes two surgery rooms, a closet, and an equipment room within the facility. It includes seamless integration of electrical, plumbing, and network connections tailored to specifications, followed by rigorous testing and commissioning to ensure functionality and safety while meeting regulatory standards. Ultimately, this modernization effort aims to enhance efficiency, streamline workflows, and elevate patient care standards.